index
:
xlgmokha/cs_practice.git
main
Unnamed repository; edit this file 'description' to name the repository.
git
summary
refs
log
tree
commit
diff
log msg
author
committer
range
Age
Commit message (
Expand
)
Author
2013-06-27
add default rake target
main
mo khan
2013-06-27
upgrade to ruby 2.0
mo khan
2012-04-26
add description to mono_install task.
mo k
2012-04-26
install latest rhino mocks.
mo k
2012-04-26
add rake task to install mono packages.
mo k
2012-04-26
mono tools/NuGet.exe
mo k
2012-04-26
implement Accept method on Production.
mo k
2012-04-26
extract Collect extension into a Collectable<T> class.
mo k
2012-04-26
create a Collect extension method to collect results from IVisitable's
mo k
2012-04-26
collapse nested if into single if.
mo k
2012-04-26
fix broken spec when over available plant capacity.
mo k
2012-04-24
add contains to range.
mo k
2012-04-24
start flowing a well into a facility.
mo k
2012-04-24
rename DrillSchedule to ProductionSchedule.
mo k
2012-04-23
re-organize test csproj.
mo k
2012-04-23
use Sum<T> extension method.
mo k
2012-04-23
convert Sum extension to use IUnitOfMeasure.
mo k
2012-04-23
add spec for checking quantity equality.
mo k
2012-04-23
fix the unit of measure conversions and add specs for when checking if a quan...
mo k
2012-04-23
move summation and capacity to separate files.
mo k
2012-04-23
find out which months a gas plant is scheduled to be over production.
mo k
2012-04-20
add spec to convert MCF to BOED.
mo k
2012-04-20
convert BOED to MCF.
mo k
2012-04-20
create range to iterate through a period of months.
mo k
2012-04-17
record when gas plant capacity increases.
mo k
2012-04-17
start to build a Gas Plant.
mo k
2012-04-17
rename DrillSchedule to ProductionSchedule.
mo k
2012-04-17
extract explicit query method for net production into a visitor.
mo k
2012-04-17
split classes into separate files.
mo k
2012-04-16
tease apart the net production tests.
mo k
2012-04-16
refactor tests to something that looks less of a spike.
mo k
2012-04-12
split classes into separate files.
mo k
2012-04-12
tweaked jp's continuous testing script.
mo k
2012-04-12
calculate net and gross estimated reserves.
mo k
2012-03-27
start to play with wells.
mo k
2012-03-27
change verbosity and tools version when shelling out to xbuild.
mo k
2012-03-27
add install script.
mo k
2012-03-27
remove patch level from rvmrc and remove targets file.
mo k
2012-03-27
add fluff test.
mo k
2012-03-27
make spec target mono compatible.
mo k
2012-03-27
just shell out to xbuild instead of using the albacore xbuild task.
mo k
2012-03-27
start xbuild conversion.
mo k
2012-03-27
add some fluff tests.
mo k
2012-02-06
make it pass.
mo k
2012-02-06
add albacore build.
mo k
2012-02-02
start writing Greeting specs.
mo k
2012-01-26
create 2 projects.
mo k
2012-01-26
initial commit.
mo k